Newhard Company assigns overhead cost to jobs on the basis of 115% of direct labor cost. The job cost sheet for Job 313 includes $15,745 in direct materials cost and $10,700 in direct labor cost. A total of 1,550 units were produced in Job 313. Required: a. What is the total manufacturing cost assigned to Job 313

Required:
What is the total manufacturing cost assigned to Job 313? What is the unit product cost for Job 313?