contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

Which of these substances is the most acidic? A. grapes B. baking soda C. stomach juice D. ammonia
which number is irratonal a. _/100 b. 1/8 c. -2.2675 d. 3/16
How would you define Revenge Bedtime Procrastination in your own words?
How does the slope of land or direction of plowing affect how water runs over the land?
Multiply using the vertical method
Is 4:8 a equivalent ratio?
Which of the following gave women the right to own property after marriage?
Help me with this one please​
David measured a swimming pool and made a scale drawing. In real life, the diving board is 20 feet long. It is 2 inches long in the drawing. What scale did Davi
A force of 15 newtons is used to push a box along the floor a distance of 3 meters. How much work was done?