Answer:
a) 0.128
b) 0.049152
Step-by-step explanation:
a) first strike comes on the third well drilled
=> two non-strikes and a strike
P = (0.8)^2 * (0.2)
= 0.128
b) third strike comes on the seventh well drilled
=> two strikes in first six wells and a strike in seventh
P = 6C2 * (0.2)^2 (0.8)^4 * (0.2)
= 0.049152