shycheye6152 shycheye6152 26-12-2020 Business contestada An assembly line with 15 tasks is to be balanced. The longest task is 2.9 minutes, and the total time for all tasks is 17 minutes. The line will operate for 450 minutes per day. a. What are the minimum and maximum cycle times