Nikoto Steel Co. budgeted manufacturing costs for 50,000 tons of steel are:Fixed manufacturing costs $50,000 per monthVariable manufacturing costs $12.00 per ton of steelNikoto produced 40,000 tons of steel during March. How much is the flexible budget for total manufacturing costs for March?a) $520,000b) $650,000c) $480,000d) $530,000