sandalimendes8 sandalimendes8
  • 16-12-2020
  • Mathematics
contestada

Four men take 6 days to complete a certain work. Find the number of men needed to complete the same work in 8 days

Respuesta :

scootermaster34
scootermaster34 scootermaster34
  • 16-12-2020

Answer:

the answer is 5 men i think

Answer Link
morenos2024
morenos2024 morenos2024
  • 16-12-2020
The guy above me is right
Answer Link

Otras preguntas

The president declared the prisoner a free man. Label the sentence parts by placing the correct abbreviation • S= subject; V = verb • SC = subject complement •
1 2. 4 How many 1/4 litre bottles of orange juice can be filled from a 2 litre bottle of the same juice?​
5r^2-13r-6=0 How do I solve this
HELP PLEASE Knanajaj
Which of these claims of psuedoscience most likely based on? A. Controlled Expirements B. Critical Thinking C. Creative Imagination D. Logical Reasoning I kinda
y= 3x -15 y= x+3 factor the following into two binomials
-3x-2= -3x-2= -3x1.5= -3x3=
the preamble expands on which idea found in the declaration of independence?
Which of the following linear equations are in Standard Form? y = –23 – 1 3x + y = 4. 17 3 x + 2 y = 2 - 2x – 4y=7 3x + 6y = 12 3x + 4y = 12
A cube has six sides that are numbered 1 to 6. The sides numbered 1, 3, and 5 are yellow, and the sides numbered 2, 4, and 6 are orange. What is the probability