Tayloxosupnerodine
Tayloxosupnerodine Tayloxosupnerodine
  • 17-10-2016
  • Business
contestada

The type of budget that is prepared for the expected capacity level only is called a _______. static budget. flexible budget. continuous budget. master budget.

Respuesta :

Erudite1
Erudite1 Erudite1
  • 28-10-2016
The budget that is prepared for the expected capacity level only is called a fixed or static budget.
Answer Link

Otras preguntas

. phase ________ of clinical testing is required by the fda before drug approval and uses the greatest number of subjects. a. 1 c. 3 b. 2 d. 4
How HIV/AIDS Is commonly spread in the context of unequal power relation leading social injustices among married couples?
another word for a pencil not found in the dictionary
the total number of species in an area is termed
This image shows a child's fingers dipped in paint colors and smeared on blank paper. What type of interpretation is this description?
A chef is going to use a mixture of two brands of Italian dressing. The first brand contains 8% vinegar, and the second brand contains 13% vinegar. The chef
to support life, why must a planet have a roughly circular orbit around a star? A. so freshwater Is available B. to keep the proper air molecules in the atmosph
In a bag of marbles, you have 4 green, 3 yellow, 5 blue, and 8 red marbles. What is the probability of picking a green marble from the bag? a) 3/20 b) 1/5 c) 1
Golf scores represents the number of strokes above or below par. A negative score means that you hit a number below par while a positive score means that you hi
HELP ME PLEASE 25 points