Answer:
a.
Step-by-step explanation:
for A, put a dot on (0,2) and (1,5) and connect them (arrow should be pointing up)
then make another line by plotting a dot on (0,-2) and (1,-4) (arrow should be pointing down)
since the < and > have an equal to (_) line at the bottom, the point/dot at (0,2) and (0,-2) have to be filled in