Mommylilangel1023 Mommylilangel1023
  • 29-11-2020
  • Mathematics
contestada

a construction crew has just built a new road. they worked for 4 weeks. they built the road at a rate of 10.24 kilometers per week. how many kilometers of road did they build?

Respuesta :

Mashhhh Mashhhh
  • 29-11-2020
40.96 kilometers

4 x 10.24 = 40.96
Answer Link

Otras preguntas

Add the first, fourth, and tenth terms of the arithmetic sequence described by the given rule.
[3-(4+3^2*8)divide by 4]
​the transition to oil paint in the fourteenth and fifteenth centuries was gradual. for many years, it was only used for __________ in order to give the paintin
The length of shadow of a building is 90 meters,as shown below: What is the height of the building? A. 180 m B. 51.96m C. 155.88m D.60m
Select the correct product of (x2 + 3)(x3 – 5)
Ruben's family members drink alcohol while they're watching television every evening. Most nights they drink too much and get drunk. They allow Ruben to drink a
Which is an exponential growth function? F(x)=6(0.25)^x F(x)=0.25(5.25)^x F(x)=-4.25x F(x)=(-1.25)x
The 12.0n block descends 0.75m. at constant speed. how much work is done on the 12.0n block by gravity?
which best describes what is happening in section B?
What are the requirements for combustion of a candle?