Answer:
Explanation:
Step one:
given data
mass of cable= 4lb/ft
mass of coal= 1000lb
dept of mine= 700ft
Step two:
Required
the work-done to lift the coal and the rope combined
Work-done to lift coal
Wc=1000*700= 700,000 lb-ft
Work-done to lift rope
[tex]Wr=\int\limits^{700} _0 {4(700-y)} \, dx \\\\Wr=4(700y-\frac{1}{2}y^2 )\limits^{700}_0[/tex]
substitute y=700 we have, since y=0 will result to 0
[tex]Wr=4(700*700-\frac{1}{2}*700^2 )\\\\Wr=4(490000-245000)\\\\Wr=4(245000)\\\\Wr=980000ft-lbs[/tex]