Answer:
35 minutes
Explanation:
The expected capacity requirement for a copy machine center to do this job is 35 minutes
DATA
Total pages = 700 (500+200)
Copying rate = 25
Copying time = (500+200)/25 = 28 minutes
OverallSetup time = 5 minutes
Color change time = 2 minutes
Solution
Cycle time = 28 + 5 + 2
Cycle time = 35 minutes