The copy center has a job order that requires 500 pages of white and 200 pages of pink. The copying rate is 25 pages per minute, the overall setup time is 5 minutes, and the color change time is 2 minutes. What is the expected capacity requirement for the copy machine center to do this job

Respuesta :

Answer:

35 minutes

Explanation:

The expected capacity requirement for a copy machine center to do this job is 35 minutes

DATA

Total pages = 700 (500+200)

Copying rate = 25

Copying time = (500+200)/25 = 28 minutes

OverallSetup time = 5 minutes

Color change time = 2 minutes

Solution

Cycle time = 28 + 5 + 2

Cycle time = 35 minutes