2846982279
2846982279 2846982279
  • 02-11-2020
  • Physics
contestada

15.0 kg mass is displaced 3.00 m south and then 4.00 m west by a 10.0 N force. What is the total work done on the object?
a. 25.0 J b. 30.0 J c. 40.0 J d. 70.0 J

Respuesta :

rser7383 rser7383
  • 02-11-2020

Answer: D. 70.0 J

Explanation:

3.00 m + 4.00 m = 7.00 m x 10.0 N = 70.0 J

Answer Link

Otras preguntas

i need help ASAP :(
Derrick adds equations A and B to solve this system of equations. What makes this approach a valid method in general for solving a system of equations?
What is the length of BC in the right triangle below?
Assume that input file references a Scanner object that was used to open a file. Which of the following while loops shows the correct way to read data from the
Can you subtract 7-m?
Into which category of transition words does "as a result" fall?
Southern states sometimes used a grandfather clause to allow them to
When light with a frequency f1 = 547.5 THz illuminates a metal surface, the most energetic photoelectrons have 1.260 x 10^-19 J of kinetic energy. When light wi
help *10 pts* asappp
How do entrepreneurs cause economic expansion? by introducing new products that encourage consumer spending by using competition to drive down the prices of con
ACCESS MORE