Answer:
a) 4.21 min
b) 21.9666 hrs
c) 1.3657 Pc/hr
Explanation:
Given that;
Batch quantity = 300 units
time setup = 55min
unload/loading time = 0.75
processing time = 3.46
a) Average cycle time;
Average Cycle Time TC = loading time + processing time
TC = 0.75 + 3.46
Tc = 4.21 min
b) Time to complete the batch
Time to complete the batch Tb = setup time + process time + non operation time
Tb = (55min * 1hr/60min) + (300 * 3.46 * 1hr/60min) + (300 * 0.75 * 1hr/60min)
Tb = 0.9166 + 17.3 + 3.75
Tb = 21.9666 hrs
c) Average production rate
Average production rate Rp = 1 / ( Tb / batch size)
we substitute
Rp = 1 / ( 21.9666 / 300 )
Rp = 1 / 0.7322
Rp = 1.3657 Pc/hr