Kiesha can install a fence in 3 days. Robert can install the same fence in 8 days. How long, in days,
would it take Kiesha and Robert to install the fence if they worked together?

Respuesta :

EH3633 EH3633
  • 01-10-2020

Answer:

5.5 days

Step-by-step explanation:

you need to find the average between them so add them up and divide by 2.

Answer Link

Otras preguntas

What value of x makes the equation true?
Essay for James Madison: The Forgotten Founder
Solve the following equation for x : 4x−2(x+1)=x−9 x=1 x=-4 x=9 x=-7
What is the single source of both electrons used by AND the oxygen created by photosynthesis?
What is the momentum of a 5-kg bowling ball when at rest?
How do political parties influence the running of government?
I Need Help With A Story Called Theseus And The Minotaur Describe All The Question All The Way To 6 Please I Have 60 Points To Give Away For The Person That Ans
What is the additive inverse of (-2m)?
A mixture made of two or more elements that has the properties of a metal is a(an)?
1 Which equation below has a y-intercept at (0, 2) and a slope of 3 of the ?​
ACCESS MORE