Answer:
$52,285
Explanation:
The computation of the total manufacturing cost assigned to Job P is shown below:-
Total manufacturing cost = Direct material + Direct labor + Manufacturing overhead applied
= $13,000 + $21,000 + (2,300 × $7.95)
= $13,000 + $21,000 + $18,285
= $52,285
Therefore for computing the total manufacturing cost assigned to Job P we simply applied the above formula.