Answer:
the MIRR of a project is 19.0%.
Explanation:
The First Step is to Calculate the Terminal Value at end of year 3.
Terminal Value (FV) = Sum of (PV x (1 + r) ^ 3 - n)
= $50 x (1.119) ^ 2 + $50 x (1.119) ^ 1 + $50 x (1.119) ^ 0
= $62.61 + $55.95 + $50.00
= $168.56
The Next Step is to Calculate the MIRR using a Financial Calculator :
-$100 CFj
0 CFj
0 CFj
$168.56 CFj
Shift IRR/Yr 19.0104% or 19.0%
Therefore, the MIRR is 19.0%.