Respuesta :

Answer:

3/8 project per hour

Step-by-step explanation:

Take the part of the project done and divide by the time

3/10 project ÷ 4/5 hours

Copy dot flip

3/10 * 5/4

Rewriting

3/4 * 5/10

3/4 * 1/2

3/8 project per hour

Answer:

3/8

Step-by-step explanation:

3/10 div 4/5

Divide 3/10=0.3 by 4/5=0.8 by multiplying 3/10=0.3 by the reciprocal of  4/5=0.8.

3/10x(5/4)

Multiply 3/10 =0.3 times 5/4 =1.25 by multiplying numerator times numerator and denominator times denominator.

3x5/10x4

Do the multiplications in the fraction 3×5/10x4

15/40 = 0.375

Reduce the fraction  15/40 = 3/8 =0.375 to lowest terms by extracting and canceling out 5.

3/8

ACCESS MORE