Respuesta :
Answer:
3/8 project per hour
Step-by-step explanation:
Take the part of the project done and divide by the time
3/10 project ÷ 4/5 hours
Copy dot flip
3/10 * 5/4
Rewriting
3/4 * 5/10
3/4 * 1/2
3/8 project per hour
Answer:
3/8
Step-by-step explanation:
3/10 div 4/5
Divide 3/10=0.3 by 4/5=0.8 by multiplying 3/10=0.3 by the reciprocal of 4/5=0.8.
3/10x(5/4)
Multiply 3/10 =0.3 times 5/4 =1.25 by multiplying numerator times numerator and denominator times denominator.
3x5/10x4
Do the multiplications in the fraction 3×5/10x4
15/40 = 0.375
Reduce the fraction 15/40 = 3/8 =0.375 to lowest terms by extracting and canceling out 5.
3/8