Answer:
29.71 per machine-hour
Explanation:
Buker corporation has an estimated machine hours of 74,000
The estimated variable manufacturing overhead is 7.67 per-machine hour
The estimated total fixed manufacturing overhead is $1,630,960
The first step is to calculate the estimated overhead cost
= (74,000×7.67) + $1,630,960
= 567,580 + $1,630,960
= $2,198,540
Therefore, the predetermined overhead rate can be calculated as follows
Predetermined Overhead rate= Estimated manufacturing overhead cost/Estimated machine hours allocated
= $2,198,540/74,000
= 29.71 per machine-hour
Hence predetermined overhead rate for the recently completed year was closest to 29.71 per machine-hour