Answer:
260 meters.
Step-by-step explanation:
It is given that construction crews A,B,C and D build a 1200 meter long road.
[tex]A+B+C+D=1200[/tex] ...(1)
Team A builds 1/2 of the total length built by the other 3 teams. So,
[tex]A:(B+C+D)=1:2[/tex]
It means total distance divided in 1:2.
[tex]A=1200\times \dfrac{1}{1+2}=1200\times \dfrac{1}{3}=400[/tex]
Similarly,
Team B builds 1/3 of the total length built by the other 3 teams.
[tex]B:(A+C+D)=1:3[/tex]
It means total distance divided in 1:3.
[tex]B=1200\times \dfrac{1}{4}=300[/tex]
C builds a section that is 1/4 of the length built by the other teams.
[tex]C:(A+B+D)=1:4[/tex]
It means total distance divided in 1:4.
[tex]C=1200\times \dfrac{1}{5}=240[/tex]
Now, put A=400, B=300 and C=240 in (1).
[tex]400+300+240+D=1200[/tex]
[tex]D=1200-940[/tex]
[tex]D=260[/tex]
Therefore, 260 meters build by D.