Answer:
The predetermined overhead rate is closest to $12.10 per hour
Explanation:
Predetermined overhead rate = (Estimated total fixed manufacturing overhead / Estimated direct labor hours)
Predetermined overhead rate =($121,000 / 10,000)
Predetermined overhead rate = $12.10 per hour