Answer:
The correct answer is A.
Explanation:
Giving the following information:
Activity Cost Pool Activity Measure Total Cost Total Activity
Machining Machine-hours $330,000 15,000 MHs
To calculate the predetermined manufacturing overhead rate we need to use the following formula:
Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Machinning:
Predetermined manufacturing overhead rate= 330,000 / 15,000
Predetermined manufacturing overhead rate= $22 per machine-hour
Machine setups:
Number of setups $50,000 100 setups
Predetermined manufacturing overhead rate= 50,000/100
Predetermined manufacturing overhead rate= $500 per set-up