Answer: $1700000
Explanation:
If the firm was to consider using the land and facility in a new project, the cost that should be included I the project analysis should be the cost of land and the building facility that was given in the question. This is so because that is the relevant cost to be included in the project analysis. The relevant cost is $,1700,000 which is the bid received for land and building by the firm.