Respuesta :
Answer:
1.The normal spoilage rate is 15%
2.a The journal entry to record the normal spoilage, assuming The spoilage is related to a specific job is the following:
Material Control A/c Dr. $ 1,410
To Work in progress control (Job # 10) A/c Cr. $ 1,410
b. The journal entry to record the normal spoilage, assuming The spoilage is common to all jobs is the following:
Material Control A/c Dr. $ 1,410
Manufacturing overhead control A/c Dr. $ 5,190
To Work in progress control (Job # 10) A/c Cr. $ 6,600
c. The journal entry to record the normal spoilage, assuming The spoilage is considered to be abnormal spoilage is the following:
Material Control A/c Dr. $ 1410
Loss from Abnormal spoilage A/c Dr. $ 5190
To Work in progress control (Job # 10) A/c Cr. $ 6600
Explanation:
1.In ordert to calculate the normal spoilage rate we would have to use the following formula:
normal spoilage rate= (6 spoiled units / 40 good units)
= 0.15
= 15%
The normal spoilage rate is 15%
2.a Material Control A/c= 6 spoiled units * 235 per unit=$ 1,410, Therefore, the journal entry to record the normal spoilage, assuming The spoilage is related to a specific job is the following:
Material Control A/c Dr. $ 1,410
To Work in progress control (Job # 10) A/c Cr. $ 1,410
b. Material Control A/c= 6 spoiled units * 235 per unit=$ 1,410
Manufacturing overhead control A/c= [6 spoiled units * ($1,100 - $235) per unit]=$ 5,190, Therefore, the journal entry to record the normal spoilage, assuming The spoilage is common to all jobs is the following:
Material Control A/c Dr. $ 1,410
Manufacturing overhead control A/c Dr. $ 5,190
To Work in progress control (Job # 10) A/c Cr. $ 6,600
c. Material Control A/c= 6 spoiled units * 235 per unit=$ 1,410
Loss from Abnormal spoilage A/c=[6 spoiled units * ($1,100 - $235) per unit]=$ 5,190, Therefore, the journal entry to record the normal spoilage, assuming The spoilage is considered to be abnormal spoilage is the following:
Material Control A/c Dr. $ 1410
Loss from Abnormal spoilage A/c Dr. $ 5190
To Work in progress control (Job # 10) A/c Cr. $ 6600