Answer:
The work done on the jet by the catapult is 1.53 x 10⁷ J
Explanation:
Given;
force of thrust engines, F = 2.3 x 10⁵ N
distance moved by the thrust engines, d = 90 m
kinetic energy of the plane, K.E = 3.60 x 10⁷ J
Based on work-energy theorem;
the net work done on the plane by catapult and the thrust engine is given as;
[tex]W_n = K.E_f = 3.6 *10^7 \ J[/tex]
work done by the thrust engine on the jet;
[tex]W_T_._e_n = fd\\\\W_T_._e_n = 2.3*10^5 * 90\\\\W_T_._e_n = 2.07*10^7 \ J[/tex]
Work done on the jet by the catapult;
[tex]W_c_p= W_n - W_T_._e_g\\\\W_c_p= (3.6*10^7 - 2.07*10^7) J\\\\W_c_p= 1.53*10^7 \ J[/tex]
Therefore, the work done on the jet by the catapult is 1.53 x 10⁷ J