Notoriouswolf73
Notoriouswolf73 Notoriouswolf73
  • 30-04-2020
  • Physics
contestada

How much work must be done on a 5-kg sled to increase its speed from 10
m/s to 15 m/s?

A. 25

B. 312.5 J


C. 562.5 J
D. 5

Respuesta :

MathPhys
MathPhys MathPhys
  • 30-04-2020

Answer:

B. 312.5 J

Explanation:

Work = change in energy

W = ½ mv₂² − ½ mv₁²

W = ½ m (v₂² − v₁²)

W = ½ (5 kg) ((15 m/s)² − (10 m/s)²)

W = 312.5 J

Answer Link

Otras preguntas

why does molting occur?
what does plot development mean in drama
How does a function relate to a formula in Microsoft word
Why is the Battle of Marathon a defining moment in the development of European culture?
what object in the sky is used to determine local time ?
photosynthesis is 6CO2 + 6H2O → C6H12O6 + 6O2 1) How many molecules of carbon dioxide are shown in this equation? a-6 b-12 c-8 d-24
Okay people! I need help. In geometry, on a x/y coordinate plane, I need to find the distance between the point (3,2) and the slope y = 5/6x + 7. Step by step,
Which type of rock is formed by magma erupting from a volcano?
In the 1700s, Latin American politics was dominated by ?
levels of organization from small to big