A flexible budget:a) Is designed to be adjusted at frequent intervals for changes in the general price level. b) Consists of estimates of costs and expenses for various possible levels of activity.c) Cannot be prepared when a standard cost system is in use. d) Is better suited for use with a job cost system than a standard cost system.