Answer:
a. 32 secs
b. 3.75 or 4
Explanation:
The computation is shown below:
(a) Cycle Time is
= Operation time per week ÷ output per week
= (40 hours × 60 × 60) ÷ (4,500)
= 32 secs
(b) And, the Theoretical minimum number of workstations required is
= Sum of total task times ÷ cycle time
= (22 + 30 + 15 + 14 + 12 + 27) ÷ (32 sec)
= 3.75 or 4
By applying the above formulas we can get the cycle time and the theoretical minimum number of work stations