Answer:
$130 per inspection
Explanation:
Activity-based overhead rate used = Expected overhead cost ÷ Number of expected inspections = $520,000 ÷ 4000 = $130 per inspection
Therefore, the activity-based overhead rate used to assign the costs of the inspecting cost pool to products is $130 per inspection.