Respuesta :
Answer:
20units per hour
Explanation:
Because The capacity at stamping is 120/(90+120*0.5+9-+240*0.5)*60=20 units per hour. The capacity at assembly is 1/30*12*60=24 units per hour. Therefore, stamping is the bottleneck.
Answer:
Since there is adequate interest to sell eve, bike as Were is adequate interest, along these lines Were would be no bottleneck and the group delivered at the stepping stage will go straightforwardly to the assembly stage
At assembly stage:
Labor time required to assemble each product by a labor = 30 minutes
[tex]Process capacity = \frac{1}{30} minutes[/tex]
[tex]Process capacity = \frac{1}{30} *60[/tex]
[tex]Process capacity = 2 Unit Per Hours[/tex]
Process capacity when 12 labors are engaged = 2 units per hour × 12
Process capacity when 12 labors are engaged = 24 units / hr
One approach to expand limit is by expanding the numbs of laborers at the get together as the interest is adequate henceforth expanding of laborers would build number of units created
Batch size = 120 for A; Batch size = for B
It is the right choice to minimize inventory and maximize flow rate.