Respuesta :
Answer: yes
Explanation:
Upper specification = 30 minutes
Lower specification = 20 minutes
Average service = 26.26minutes
Sigma= 1.35 minutes
The lab process is capable of four sigma level performance.
The average turnaround = 26.2
Standard deviation = 1.35 minutes
Nominal value for service = 25 minutes
Upper specification= 30 minutes
Lower specification = 20 minutes
[tex]Cpk = Minimum[\frac{X-lower specification}{3Sigma} ,\frac{Upperspecification-X}{3sigma} ][/tex]
[tex]Cpk =Minimun [\frac{26.2-20}{3*1.35} ,\frac{30-26.2}{3*1.35} ]\\\\= Min[1.53, 0.94][/tex]
The minimum is 0.94.
[tex]Cp = \frac{Upper-lower}{6Sigma} \\\\Cp = \frac{30-20}{6*1.35} \\\\= 1.23\\\\[/tex]
The lab process is capable of four sigma level performance.
Read more on https://brainly.com/question/4050666?referrer=searchResults