Tim installs 50 square feet of his floor in 45 minutes. At this rate, how long does it take him to install 495 square feet? (Please show ur work)

Respuesta :

Answer:

445.5min=595²ft

Step-by-step explanation:

y=0.9x

y=0.9*495

y=445.5

Answer:

445.5 minutes

Step-by-step explanation:

Tim installs 50 square feet of his floor in 45 minute . Let us calculate it as a rate

Since he installs 50 ft² of his floor in 45 minute. How many square ft will he install in 1 minutes

50 ft² → 45 minutes

? →         1 minute

he will install 50/45 ft² per minute

50/45 ft² →  1 minute

495 ft² → ? minute

cross multiply

495 × 45/50

22275 /50

445.5 minutes

ACCESS MORE