Answer:
6 Full Time Employees
Step-by-step explanation:
It takes 20 minutes to code each record.
Therefore, in 1 hour, number of records per coder = 60/20 = 3 records
Since each coding professional works 7.5 productive hours per day.
Number of Records Per Day for each coder
=(3X7.5) = 22.5 records
Assume a 5-Week Day
Number of Records that must be treated = 600/5 = 120 records a day
Number of FTE Employees needed
= 120 / 22.5 = 5.33
The employer will require at least 6 FTE since Number of Employees is a discrete data.