Answer:
The correct answer is A.
Explanation:
Giving the following information:
Saylind Molding paid $280,000 in rent for the year.
We need to allocate overhead based on a cost pool of our choosing. I will consider choosing square footage because it is evenly distributed between the departments. The number of employees is significantly higher in the Floor Mats department.
First, we need to calculate the estimated overhead rate:
Estimated manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Estimated manufacturing overhead rate= 280,000/ (5,000 + 6,300 + 2,700)= 280,000/14,000= $20 per square foot.
Now, we can allocate overhead to Floor Mats department:
Allocated MOH= Estimated manufacturing overhead rate* Actual amount of allocation base
Allocated MOH= 20*2,700= $54,000