Respuesta :

Answer:

15 days

Step-by-step explanation:

a=  25+5=30

b=20+5=25

30-25=15 days

Answer:

11days

Step-by-step explanation:

If A can do the job in 25days.

A's 1 day's job = 1/25

If B can do the job in 20days.

B's 1 day's job = 1/20

Therefore the job done by A and B together in 1day = 1/25 + 1/20 = 9/100

But they both work together for 5 days. So the job done by both of them in 5 days = 9/100 x 5 = 9/20

Since A left, the remaining job will be = 1 — 9/20 = 11/20

If B's 1 day's job = 1/20

Then B's x day's job = 11/20

B's xday = (11/20) / (1/20) = 11/20 x 20 = 11 days

Therefore, B can finish the remaining job in 11days