muluegrw muluegrw
  • 28-02-2020
  • Mathematics
contestada

In 9 days, a group of workers can plant 45 acres. What is their rate in acres per day?

Respuesta :

wavemoon59 wavemoon59
  • 28-02-2020

Answer:

5 acres a day

Answer Link
Tirone Tirone
  • 28-02-2020

the correct answer must be five because you need to divide 45 by 9!

Answer Link

Otras preguntas

solve quadratic equation by factoring How do you do it 3k^2 + 72 = 33k
how do I figure out what 5550/1000
What is the volume of a rectangular box that has base area of 75 square inches and a height of 20 inches
what were some of the problems that led to the rise of dictators in germany ,italy ,and japan?
A bag has index cards with the following numbers on them: 4, 11, 13, 25, 12, and 18. If an index card is drawn randomly , what is the probabilty that a composit
Slope= 1/5, y-intercept=1
what were the four main causes of the Cold War
a swimming pool is 20 meters long and 12 meters wide the bottom of the pool is slanted so that the water depth is 1.3 at the shallow end and 4 meters deep at th
Which of the following factors does not favor a change in gene frequency and, therefore, evolution? (A) large populations (B) mutations (C) emigration (D) genet
when the Lenape hunted
ACCESS MORE