Answer:
The required LP is:
Min z = 15 x1 + 10 x2 + 20 x3
0.1 x1 + 0.2 x2 + 0.4 x3 ≥ 30 (Pollutant 1 constraint)
0.45 x1 + 0.25 x2 + 0.3 x3 ≥ 40
(Pollutant 2 constraint)
x1, x2, x3 ≥ 0
Step-by-step explanation:
Let x1, x2 and x3 represent the amount of waste produced by factory 1,2 and 3 respectively.
Min z = 15 x1 + 10 x2 + 20 x3
0.1 x1 + 0.2 x2 + 0.4 x3 ≥ 30 (Pollutant 1 constraint)
0.45 x1 + 0.25 x2 + 0.3 x3 ≥ 40
(Pollutant 2 constraint)
x1, x2, x3 ≥ 0