Answer:
$5.184
Explanation:
The cost can be calculated using the formula: [tex]Cost = Load \ factor \times Number \ of \ hours \ \\M_{month} = M_{units} \times W\\[/tex]
Before using this, we require the following conversions:
320 W → kW:
[tex]\frac {320}{1000} = 0.32[/tex]
30 Days → Hours:
[tex]30 \times 24 = 720[/tex]
Using the above stated formula:
[tex]M_{month} = 0.09 \times 0.32 \times \frac{1}{4} \times 720 = 5.184[/tex]