dgennasab dgennasab
  • 17-01-2020
  • Advanced Placement (AP)
contestada

what is sequencing in home management​

Respuesta :

cmummert99
cmummert99 cmummert99
  • 18-01-2020
Sequence activities is the process of identifying and documenting relationships among the project activities. In the project management, the key benefit of this type of process is that it defines the logical sequence of work to obtain the greatest efficiency given all project constraints.
Answer Link

Otras preguntas

A rectangles length is 7 inches greater than its width. If the perimeter of the rectangle is 110 inches, find its length and width. I think it's w (w+7)=110
What are the disadvantages of wind pollution
Emily needs to buy fabric to make curtain panels for her windows. Each panel will be 4 feet long and 1/2 foot wide. Each piece of fabric that she can buy is 4 f
Jim uses ribbon for bookmarks. Jim has 9 feet of ribbon. He uses 1/3 foot of ribbon to make each bookmark. What is the total number of ribbons Jim can make from
What was an effect of major environmental issues that occurred in the 1960’s?.
what patterns are there in prime numbers
Work out 3\5 of 7? Working out will help too, thanks:)
What type of government does Myanmar/Burma have??
Which group convinced President James Madison to go to war with England in 1812? A. land-hungry politicians from the West and South B. angry veterans of the Rev
Much of Europe was drawn into the war because of what?