Respuesta :
Answer:
(D) 10 seconds
Explanation:
The Houston Methodist Hospital automated the emergency power supply system (EPSS) testing processes in order to ensure the safety of patients during an outage
There is an emergency power generator that turns on to supply emergency power after normal power shuts down within 10 seconds.
Answer:
D. 10 seconds
Explanation:
The Houston Methodist Hospital has eleven diesen powered generators that turn on at most 10 seconds after the normal power shuts down.
Considering that it is a hospital, this system is really important.
So the correct answer is:
D. 10 seconds