Answer:
A) 19.91%
Explanation:
Net present value of cash flow at 19.91% can be calculated as follows
- 100000 + 30000/1.1991 + 30000/ (1.1991)² + 30000/(1.1991)³ + 30000/ (1.1991)⁴ +30000/(1.1991)⁵ + 30000/ (1.1991)⁶
= -100000 + 25018 +20864 +17400 +14511 +12101 +10092
= 0 ( approx )
So the IRR for the project is 19.91 % .