Respuesta :
Based on the problem Carl will complete...
1/6 of the job per minute.
Fred will complete 1/8 of the job per minute.
Together they will complete... 1/6+1/8 of the job per minute.
That would be 7/24.
How long will that take?
1/(7/24)=24/7=3 3/7
It will take 3 and 3/7 minutes to finish washing the car.
Answer:
3.5 minutes.
Step-by-step explanation:
If Fred can wash 1/6 of a car in 1 minute and Carl can was 1/8 of a car in a minute as well then together in 1 minute it would be:
= 1/6 + 1/8
= 4/24 + 3/24
= 7/24
= [tex]3\frac{3}{7\\}[/tex]
= 3.429
So we have:
≈ 3.5 min
I hope this helps!