trintin4354 trintin4354
  • 27-12-2019
  • Computers and Technology
contestada

Users at UC need to be able to quickly create a Resource record from the Project record's Chatter feed How should the App Builder define this functionality?

Respuesta :

josephsmith041496
josephsmith041496 josephsmith041496
  • 28-12-2019

Answer:

The app builder should create a custom “Create a Record” Action on the Account.

Answer Link

Otras preguntas

During the civil war, what region had the advantage of having many army officers with training and experience obtained at the famed west point? north south
What is: 3✖️(-4)➗(-2) -9 ——————— (+6)
PLEASE HELP ME!!!!!!!!!!!!!!!!!!!!! write a adverb phrase about music
how can you produce an n type diode
There are 17 students in a class. on the day the test was given, john was absent. the other 16 students took the test, and their average score was 77. the next
The ratio of the width to the length of a painting is 3 to 7. If the painting is 43 inches long, how wide is it?
What is false productivity
A line with a slope of 0 passes through the point (-5, 6) . what is its equationin slope -intercept form?
round 8.35 to the nearest whole number
can someone help me?! i’m stuck between two.