Answer:
It will be a vertical line parallel to y-axis, passing through point [tex](-4,0)[/tex], the graph is shown below.
Step-by-step explanation:
Mark the point [tex](-4,0)[/tex], it will lie on x-axis.
Drop a perpendicular line passing through [tex](-4,0)[/tex] parallel to y-axis.
That is the require graph.