contestada

At a dock, a crane lifts a 2009 kg container 20 m, swings it out over the deck of a freighter, and lowers the container into the hold of the freighter, which is 8 m below the level of the dock. The acceleration of gravity is 9.81 m/s 2 . Neglect friction losses. How much work is done by the crane on the container? Answer in units of kJ