The number of hours of training time received by employees and the time it took​ (in minutes) for them to trouble shoot their last process problem was estimated using a regression equation. The​ 95% prediction interval for trouble shooting time with 8 hours of training was determined to be 12.822 to 19.261. What is the correct interpretation of this prediction​ interval?