Answer:
It takes Michael 1 hour, 14 minutes and 7 seconds to seal the driveway close
Step-by-step explanation:
Hi
Leon do the work in 17 hours that means the rate of his work is [tex]\frac{1}{17} work/hr[/tex], so he do [tex]\frac{2}{17}[/tex] of the work in two hours, therefore Michael do the other [tex]\frac{15}{17}[/tex] of the work, thus Michael rate will be [tex]\frac{15}{17} \div\frac{1}{2} =\frac{30}{17} work/hour[/tex].
So it takes Michael [tex]1h+\frac{4}{17}h[/tex] to complete the work, or [tex]\frac{4h}{17} \times \frac{60min}{1hour} =14\frac{2}{17} min\\\\\frac{2}{17} min \times \frac{60 secs}{1min}=7secs[/tex]
[tex]1h \ 14 min \ 7secs[/tex]