leveled cost of electricity LCOE is 0.1159/kwh
Explanation:
given data:
installation cost of system = $1.50/winstalled
capacity factor = 22%
life = 10 year
rate of interest 8%
operation and maintenance cost = $0.04 / kwh generated
capcaitence recovery factor[tex] CRF = \frac{i(i+1)^n}{(i+1)^n -1}[/tex]
i= rate of interest
n = annuity period
[tex]CRF = \frac{0.08(1+0.08)^10}}{(1+0.08)^{10} -1} = 0.14903[/tex]
[tex]LCOE = \frac{cost\ of \installation \times CRF}{hours/ available \times capacity\ factor} + variable\ o&M\ cost[/tex]
[tex]= \frac{1.50\times 1000/kw \times 0.14903}{8760\times 0.22} + 0.04/kwh[/tex]
= 0.1159/kwh + 0.04 /kwh