Answer:
The average fixed cost to produce 7,000 can openers was $17,000
Explanation:
The fixed cost are those who don't change based on the production levels, while the variable costs depends on the production.
If we add variables cost with fixed cot we will get the total cost.
Variable cost + Fixed Cost = Total cost
Then for knowing the fixed cost we should substract to the total cost the variable cost
Fixed Cost = Total Cost - Variable Cost Now replace the values
Fixed Cost = $45,000 - 28,000
Fixed Cost = $ 17,000
The average fixed cost to produce 7,000 can openers was $17,000