Answer: The following is not considered when you are calculating cost of quality: The cost of gaining formal acceptance of project deliverable.
Cost of Quality contains all the costs that are both internal and external to the system; whereas, the Cost of Quality include the conformance, considering any costs connected with both appraisal and interference.
Cost of Quality is calculated as :
Cost of Quality = Cost of Poor Quality + Cost of Good Quality