Government leaders have decided to build a new school for the local school district.

For which projects would a government leader most likely use a cost-benefit analysis? Check all that apply.

Respuesta :

Answer:

b, c, d, e

Explanation:

trust :) got in right on edge

The projects for which government leaders will use a cost-benefit analysis will be,

  1. The exterior color of the building;
  2. The type of technology used within the school;
  3. The equipment needed in the cafeteria to provide healthy or unhealthy lunches;
  4. The installation of a fountain at the front of the building.

What is cost benefit analysis?

An analysis that allows a comparison between the different amounts of costs that will be derived upon the use of alternatives to derive the maximum potential benefit, typically at the lowest cost, is known as the cost-benefit analysis.

Government leaders can derive the maximum benefits if they follow the cost-benefit analysis for the projects as mentioned above.

Hence, options A, B, C and D holds true regarding cost-benefit analysis. The complete question has been added as an image for better reference.

Learn more about cost-benefit analysis here:

https://brainly.com/question/15411875?

#SPJ2